Your furnace gets a new filter. Your car gets an oil change. Your driveway gets nothing until a slab drops or the apron starts flaking.
Concrete doesn't ask for much, but it needs the right things at the right time. In northeast Wisconsin, frost, snowmelt, and road salt set that timing, which is why a generic list misses the point.
Here's the whole plan: a monthly calendar, what changes as a slab ages, the jobs that come around every few years, a printable checklist, and a simple way to keep records. For most homes it adds up to a few hours a year.
The 12-Month Calendar
The temperatures are Green Bay's 1991–2020 normals. They matter because most joint sealants and penetrating sealers want about 40°F and up, and lifting needs thawed ground.
| Month | Normal high / low | What to do |
|---|---|---|
| January | 26°F / 11°F | Shovel before snow packs down so you need less deicer. Keep downspout outlets clear of ice. |
| February | 29°F / 13°F | Same as January. Photograph any slab riding higher than usual (frost heave). |
| March | 40°F / 24°F | Rinse salt off on above-freezing days. Photograph where meltwater pools. Don't judge sinking yet. |
| April | 54°F / 35°F | Sweep up winter sand. First walk-around. Send photos for any lifting quote. Too cold at night to seal. |
| May | 67°F / 46°F | Re-check slabs once the frost is out. Clean, lift, and caulk on dry days of 40°F or warmer. |
| June | 77°F / 56°F | Seal if it's due, after the caulk cures. Compare everything against your March photos. |
| July | 81°F / 60°F | Pull weeds from joints and note which joints are open. Sweep fertilizer off drives and walks. |
| August | 79°F / 58°F | Water-test sealed surfaces. Clean anything you plan to seal this fall. |
| September | 72°F / 50°F | The best month to caulk and seal. Re-check grading and downspout extensions. Finish any lifting you've put off. |
| October | 58°F / 40°F | Finish sealing early in the month. Blow leaves off concrete. Put in driveway markers before the ground freezes. |
| November | 44°F / 29°F | Buy the right deicer before the first storm. Set snowblower skid shoes so the scraper bar doesn't gouge. Lifting season ends at freeze-up. |
| December | 31°F / 18°F | Shovel early. Pile snow where the melt runs onto lawn, not across slabs or toward the house. |
March through June has its own step-by-step guide: our spring concrete maintenance checklist. November through February, including which deicers to keep off concrete, is covered in winter concrete care. With about 56 inches of snow in a normal Green Bay year, it's worth reading. Here's what neither guide covers.
July and August: The Easy Stretch
Summer asks the least of your concrete, so use it to spot problems.
- Treat weeds in a joint as a symptom. If something is growing there, the joint is open to water. Pulling the weed is cosmetic. Sealing the joint is the fix, so note it for September.
- Sweep fertilizer back onto the lawn right after spreading. Iron in fertilizer leaves orange rust specks, and ammonium-based products can etch the surface.
- Blot oil drips while they're fresh. A week-old drip is a quick cleanup. A two-year-old stain may never fully come out.
- Run the water test in August. Sprinkle water on sealed concrete. If it beads, you're set. If it darkens and soaks in, reseal this fall. See should you seal your concrete.
September and Early October: The Window That Matters Most
Green Bay's normal low is about 50°F in September, 40°F in October, and below freezing in November. That leaves roughly six weeks to close joints and get sealer on before the salt trucks roll.
Plan backward from the first cold nights. Say you want sealer on by October 5. Polyurethane joint sealant takes about a week to fully cure, and caulk goes in before a penetrating sealer, so caulking needs to wrap up by late September. Cleaning comes before that, plus at least a day of drying. Start in mid-September and you're comfortable. Start October 1 and you're gambling.
While you're out there:
- Fill washouts along slab edges with soil, tamp it, and slope it away. The national model code for new homes calls for at least a 6-inch drop in the first 10 feet from the foundation, a good target for any house.
- Reattach downspout extensions the mower knocked loose. (How to extend downspouts)
- Put in driveway markers before the ground freezes, so the plow finds the edge of the slab instead of chewing it.
- Get wet leaf piles off concrete. They leave tea-colored stains, especially on light concrete.
Maintenance by Age
A brand-new slab and a 25-year-old slab need different things.
| Age | What's happening | Your focus |
|---|---|---|
| First year | Curing, drying, shrinking. Fresh backfill near the house is still settling. | Keep salt off, seal once cured, photograph everything as a baseline |
| Years 2–5 | Settling shows up near the foundation. Original caulk and sealer start aging. | Watch slabs nearest the house, check grading, water-test yearly |
| Years 5–15 | First reseal and re-caulk cycles. Stains build up. Sinking often appears. | Keep the cycles on schedule, deep clean, lift slabs before the drop gets big |
| 15+ years | Scaling, worn joints, and rotted wood joint strips are common. | Decide area by area: keep maintaining, restore, or replace |
The first year sets your baseline. Photograph the slab new from fixed spots. Skip deicers the first winter and use sand. Seal after it cures: sealer labels we checked typically want 14–28 days, and the weather has to fit the label, so a late-October pour gets its first seal the next late summer. Keep dumpsters and moving trucks off the edges, a slab's weakest part. Hairline shrinkage cracks are normal. A slab that drops near the house after its first thaw isn't, so call your installer while the warranty is good. See new concrete cracking.
Years 2–5: watch the house side. The soil around your basement was backfilled after the walls went up, and it keeps compacting for years. Stoops, aprons, AC pads, and walks along the foundation sit right on it. Check them with a level every spring, and re-check the grade, which settles along with the backfill.
Years 5–15: the cycles kick in. Your first reseal and re-caulk usually come due, stains add up, and sinking tends to show near downspouts. A slab that's down 1/2" is a quick fix. Let it drop for five more springs and the void under it is a lot bigger.
15 years and up: decide area by area. A solid driveway with light scaling is worth maintaining. A patio broken into six pieces isn't. Our guide to restoring old concrete walks through that call.
The Jobs That Come Around Every Few Years
| Job | Typical interval | How you know it's due | DIY or hire? |
|---|---|---|---|
| Reseal penetrating sealer | About 5–10 years, depending on product, sun, salt, and traffic | Water darkens the concrete and soaks in instead of beading | DIY on a small walk or patio; many people hire out a full driveway |
| Re-caulk joints and the house gap | Several years; often close to ten for a good sealant over backer rod | Sealant split, pulled off one side, sunk low, or sprouting weeds | DIY if the slabs are level |
| Check grading along the foundation | Every 2–3 years, and after any landscaping | Soil sits below the slab edge, or water stands against the house | DIY. Call 811 before you dig. |
| Deep clean | When stains build up, and always before sealing | The slab looks dingy, or a reseal is coming | Either |
| Garage floor coating check (if coated) | Yearly | Peeling at the door, or spots lifting under hot tires | Hire if it's failing |
A Worked Example: 12 Years on One Driveway
Here's how those intervals play out on a two-car driveway poured in June 2026, assuming the sealer lasts about six years. Your products and exposure will change the numbers. The yearly water test tells you when.
| Year | What happens |
|---|---|
| 2026 | Poured in June. Joints caulked, then the slab sealed in early September, after more than 28 days of curing. Sand only the first winter. |
| 2027 | Spring walk-around compared against the "new" photos. Apron checked with a level after its first full thaw. |
| 2028–2031 | Water test every August, walk-around every spring, torn caulk touched up as found. |
| 2032 | Water stops beading on the apron and wheel paths. Clean, re-caulk failed joints, then reseal. |
| 2033–2037 | Same yearly routine. Grading along the garage rechecked in 2034. |
| 2038 | Second reseal, with a full re-caulk the same fall. |
Notice caulking and sealing happen in the same season. Joint sealant goes in before a penetrating sealer, and one silane maker's data sheet says to test adhesion if you reverse the order. Lining the cycles up keeps the order right and saves a trip.
The Yearly Inspection Checklist
Print this and run it once a year after the frost is out, with a quicker pass in late August. Bring a tape measure, a 2-foot level, a screwdriver, and your phone. Most homes take 20–30 minutes.
Along the house
- [ ] The gap where concrete meets the foundation is sealed
- [ ] Slabs next to the house tip away from it (check with the level)
- [ ] Soil along the foundation slopes away, with no low spots
- [ ] Downspouts and the sump discharge drain onto lawn, away from concrete
Driveway and apron
- [ ] No edge between slabs higher than 1/4"
- [ ] The apron meets the garage floor without a lip, and water runs away from the door
- [ ] Joints are sealed, with no splits or weeds
- [ ] No new flaking, popouts, or plow gouges
Front walk, stoop, and steps
- [ ] No trip edges over 1/4"
- [ ] The stoop sits level or tips slightly away, with no gap at the house
- [ ] Corners sound solid when you tap them with the screwdriver handle
- [ ] No animal burrows under slab edges or the stoop
Patio
- [ ] No standing water an hour after rain
- [ ] No corners that rock underfoot
Garage floor
- [ ] No cracks that are new, widening, or offset
- [ ] Coating (if any) is intact
Sealed surfaces
- [ ] Water still beads
Anything over 1/4" goes in your log. Anything over 1/2" is a trip hazard worth fixing soon. That's the same yardstick accessibility rules use for walking surfaces.
Keep a Concrete Log
A notebook, a spreadsheet, or a notes app all work. What matters is writing the same few things every time.
| Date | Area | What you saw | Measurement | Photo | Action taken | Check again |
|---|---|---|---|---|---|---|
| 2027-04-20 | Front walk, 3rd panel from street | Low edge where it meets panel 2 | 3/8" drop | IMG_2041 | Sent photos for a lifting quote | Mid-May |
| 2027-05-18 | Same panel | Lifted flush, joints caulked | Flush | IMG_2210 | Lifted and caulked | Spring 2028 |
| 2027-08-25 | Driveway apron | Water soaks in on apron, beads elsewhere | n/a | IMG_2533 | Clean and reseal apron in September | August 2028 |
- Shoot from the same spot every time, with a tape measure in the frame for anything that has a height difference.
- Name photos by date and place, like 2027-04_front-walk.jpg, so you can find them in five years.
- Record products and dates. The sealer type and the day it went on tell you when to start water-testing. Keep receipts with the log.
The log tells you whether something is moving or just looks bad, and it makes photo quotes faster. It helps when you sell, too: Wisconsin requires sellers of most one- to four-unit homes to fill out a Real Estate Condition Report covering defects they know of, and a record of what you found and fixed makes that easier to do honestly. Ask your agent what needs disclosing.
What Maintenance Can't Fix
A schedule keeps good concrete good. It won't reverse damage that's already done.
| Problem | Why maintenance won't solve it | What does |
|---|---|---|
| Sunken or tipped slab | Caulk and sealer work on the surface. The missing support is underneath. | Lifting. See how concrete lifting works. |
| Slab pushed up by roots | Nothing pushes concrete back down | Raising the neighbors, grinding, or replacement. See tree roots lifting concrete. |
| Flaking that's already there | Sealer slows new damage. It doesn't rebuild lost surface. | Living with it, resurfacing, or replacement |
| D-cracking | The damage is inside the stone in the concrete | Replacement, long term |
| Slab broken into pieces or crumbling | No surface treatment holds it together | Replacement |
| Slab built flat or sloped toward the house | Maintenance can't change pitch, and lifting only raises | Lifting the low side if there's room; otherwise replacement |