Skip to content
(920) 655-2193|Serving Green Bay & Northeast Wisconsin
Send photos, get a price within 24 hours
Rise & Shine Concrete
Get My Price
Learn · Concrete Lifting

Our Concrete Lifting Process: From Your First Photo to a Level Slab

1Send photosThree phone photosand a tape measure2Get your priceFirm price by textwithin 24 hours3We lift itMost jobs done ina few hours
The short answer

You send photos, we send a quote, and you pick a day. On site, we find what made the slab sink, mark a hole pattern, drill a few dime-sized holes, and inject foam in small amounts while we watch the slab rise. Then we patch the holes, clean up, and show you what to fix so it doesn't happen again. Most walks take a couple of hours.

By Rob Diederich, owner · Updated
8 min read

Hiring someone to work on your house is easier when you know what's coming. Who shows up, how long they're there, what it looks like when they leave, and whether you need to take the day off.

We don't have a fancy name for how we lift concrete. It's just the way we do it, and it's the same on a single sidewalk square as it is on a whole driveway.

Here's every step, start to finish.

The Process at a Glance

StepWhat happensWhat you do
1. PhotosYou send a few pictures of the sunken concreteSnap 3–5 photos on your phone
2. QuoteWe review them and send you a quoteRead it, ask questions, say yes or no
3. SchedulingWe set a dateClear the slab and tell us what's underneath
4. Lifting dayWe assess, drill, lift, patch, and clean upNot much. Watch if you like
5. AfterThe slab is ready to useFix the water source so it stays put
  1. 1Measure and set the lineWe set a string line or laser off the concrete that didn't move and measure how far each low spot has to come up.
  2. 2Drill 5/8″ holes, set the portsPenny-sized holes go through the slab a few feet apart, kept off the edges and corners where concrete is weakest. A plastic injection port is tapped into each one.
  3. 3Inject and lift to the lineTwo liquids mix at the gun and go under the slab. The foam expands in seconds and fills the empty space first. Once the void is full, each short shot raises the slab a little. We move between holes so it rises evenly and stop at the line.
  4. 4Patch and sealThe ports come out, each hole is packed with cement grout and troweled flush, and the joints get a flexible sealant so water can't wash the soil out again.

3D renders with the ground cut away, simplified to four ports. Most residential jobs take a few hours, and you can walk on the slab when we pack up.

Step 1: Send Photos

This is the part that saves everybody time. No appointment window, no salesperson at your kitchen table.

Grab your phone and take:

  • A wide shot of the whole area, so we can see how the slab sits next to the house, the lawn, and the slabs around it.
  • A close-up of the worst edge with a tape measure standing up next to it, so we can read how far it dropped.
  • Your downspouts and sump discharge if any of them empty near the slab. Odds are one of them is part of the story.
  • Anything sitting on or touching the slab, like an AC unit, a gas meter, steps, or a post.
  • Big cracks or broken corners, up close.

Send them through the quote page with a sentence or two about what's bugging you. "It catches the snowblower" or "water pools against the garage door" tells us a lot.

Step 2: We Review and Quote

We look at three things in your photos:

  1. 1Is this a lifting job?Sunken and in decent shape, yes. Pushed up by roots or frost, crumbling, or broken into lots of pieces, probably not. If it isn't, we'll tell you what kind of fix it probably needs, even though that means you don't hire us.
  2. 2What sank it?Usually something you can see: a downspout, a washout along the edge, a low spot that holds water.
  3. 3What will it take?How many slabs, how big, how far they need to come up, and anything that complicates things, like a slab tucked under siding.

Then you get a quote with the price and what's included. If something isn't clear from the photos, we'll ask for one more picture or a measurement rather than guess. No pressure, no follow-up calls every other day. If the timing's not right, it's not right.

Step 3: Pick a Day and Get Ready

Once you say yes, we set a date. A few things help the day go smoothly:

  • Move cars, grills, planters, and furniture off the slabs we're lifting.
  • Tell us what's under or next to the slab. Buried downspout pipes, sump discharge lines, drain tile outlets, sprinkler lines, pet fence wire, landscape lighting. We don't want to drill into any of it, and foam travels into open pipes and gaps, so we want to know where they are.
  • Let us know about any recent work near the slab, like a new patio door, a repaired water line, or a sump pump that was just moved.
  • You don't have to be home for the whole job, but it's nice if you're around at the start so we can walk the slabs together and agree on the finished height.

Weather matters in Green Bay. Frozen ground can make a slab sit higher than it will in summer, so we schedule lifts around what the soil is doing.

Step 4: Lifting Day

We look before we drill

First we walk the slabs again in person. We check the height differences, tap for hollow spots, look at the joints where the slab meets the house, the garage floor, and its neighbors, and find where the water is coming from. We also confirm what "done" means for your slab. A walk might need to be flush with the next square. A garage apron needs to meet the garage floor and still drain away from the door. A patio needs to pitch away from the house.

We free up the joints

Dirt, gravel, and old caulk packed into a joint can lock a slab to its neighbor. We clean out joints and gaps where the slab needs to move, so it rises freely instead of dragging something with it.

We plan the hole pattern

Holes go where the support is missing and where the slab needs to move the most. A small sidewalk square might need just a few holes. A big driveway slab needs more. We mark them all before drilling, so the plan is set before the first hole goes in.

We drill

Each hole is 5/8", about the size of a dime. The drill makes some noise and dust for a few minutes, and that's the loudest part of the day.

We inject a little at a time

High-density structural foam goes in through one hole at a time. It fills the voids first, then starts lifting. We put in small amounts, move to the next hole, and come back, working the slab up gradually instead of shoving one spot up fast.

We watch the slab the whole time

Between every shot of foam, we check the slab against a level, a straightedge, and the slabs around it, and we keep an eye on the joints and existing cracks. That's the part of the job that separates a good lift from a bad one. We wrote a whole separate piece on it: Precise Concrete Leveling.

We fill the holes flush

Once the slab is where it belongs, every hole gets filled level with the surface. The patches are small, but you'll still be able to see them, especially on older, weathered concrete. A dime-sized dot is a lot easier to live with than a new slab that doesn't match the old ones.

We seal the joints (if you want)

Right after a lift is a good time to caulk the joints and cracks. The slab is clean, the joints are already cleared out, and closing them up means the next storm's runoff stays on top instead of heading for the foam. We can do it the same day. Just ask for it in your quote.

We clean up and walk it with you

We sweep up drilling dust and any foam overspray, pack up, and walk the finished slabs with you. Step on it, roll the trash can over it, check the drainage with a garden hose if you like.

How Long It Takes

Most residential sidewalk and walkway jobs are done in a couple of hours. A small AC pad can be under an hour. A full driveway or a garage floor with several slabs takes longer. Your quote will give you a realistic idea of how long we'll be there.

Step 5: After We Leave

  • Walk on it right away. The foam sets fast, and there's no curing period to wait out.
  • Drive on it the same day. We'll tell you when before we leave.
  • Fix the water. This is the step that decides whether your slab stays put. Extend downspouts well away from the slab. Point the sump discharge away from the house and the concrete. Fill low spots and build the soil up so it slopes away from the foundation. For new homes, the national model building code calls for a drop of at least 6 inches within the first 10 feet, and that's a good target for any house.
  • Keep joints sealed. Caulk wears out over time. If you see gaps opening up, reseal them before winter.
  • Snap an "after" photo. Take it from the same spot as your "before" photo. If anything looks different next spring, you'll have something to compare it to.

What We'll Tell You Up Front

A good lift makes your slab level, safe, and drain the right way. It doesn't make old concrete look new. Existing cracks will still be there, even if both sides end up at the same height. Surface flaking from salt and freeze-thaw stays too. If your slab has any of those, we'll point them out in the quote so nothing surprises you on lifting day.

Questions

Common questions

Do you need to come out before you can give me a quote?

Usually not. Clear photos with a tape measure in the shot tell us most of what we need. If something can't be judged from pictures, we'll ask for more photos or arrange to take a look.

Do I need to be home during the lift?

Not the whole time. It helps if you're there at the start to walk the slabs with us and confirm the plan. After that, you can go about your day.

Will it be loud or messy?

Drilling is loud for a few minutes. Injection is mostly the hum of the equipment. When we leave, you'll have a few small patches and a clean slab.

Can you seal my joints and cracks while you're there?

Yes. Joint and crack caulking pairs well with a lift, because it keeps water from getting back under the slab. Ask for it when you request your quote.

What if you find something unexpected once you start?

We stop and talk to you. If a slab won't move without risking a crack, or we find a buried pipe where we planned to drill, we'll explain what we found and what your options are before we go any further.

When can I park on it?

The same day. We'll give you the exact go-ahead before we pack up.

Keep reading

Related

Learn · Concrete Lifting
How Does Concrete Lifting Work?

How concrete lifting works, why slabs sink in northeast Wisconsin, foam vs. mudjacking vs. stone slurry vs. replacement, and what lifting can't fix.

Learn · Concrete Lifting
Precise Concrete Leveling

Why concrete lifts go wrong (over-lifting, cracked slabs, hidden voids) and the questions to ask any contractor to find out how careful they'll be.

Learn · Concrete Care
Caulking Where Concrete Meets the House

That gap between your slab and foundation sends water down the wall. How to tell if yours needs sealing, when to lift the slab first, and how it's done right.

Start With a Few Photos. No Sales Call.

Send a wide shot of the sunken concrete, a close-up of the worst edge with a tape measure, and a picture of any downspouts nearby. We'll tell you whether it's a lifting job, what it'll take, and what it costs.

Get My PriceCall (920) 655-2193