Getting New Concrete Poured in Northeast Wisconsin: A Homeowner's Spec Sheet

The short answer

For an outdoor slab in northeast Wisconsin, get these in writing before anyone digs: at least 4" of concrete (5" for heavy trucks) on 4" of compacted gravel, an air-entrained 4,000–4,500 psi mix, about 1/4" per foot of slope away from the house, control joints every 8–10 feet, and 7 days of curing. Then skip deicers the first winter.

By Rob Diederich, owner · Updated
Cracks, joints & concrete carePublished 10 min readNew concreteDriveways

Three contractors, three bids, three prices. One says "4-inch slab, mesh, broom finish." One runs two pages. One is a number on the back of a business card.

The cheapest bid is often cheapest because of what it leaves out. Hand every contractor the same spec sheet and ask them to price it, or to explain in writing where they'd do it differently.

Plain disclosure: Rise & Shine doesn't pour concrete. We lift, caulk, clean, and seal existing concrete, and we coat garage floors. We wrote this because many problems that send people looking for lifting or caulking trace back to items nobody wrote down.

Two-Minute Check: Do You Actually Need New Concrete?

What you've gotA cheaper fix that may workWhen it won't
Solid slab that sank or tips toward the houseFoam lifting: 5/8" holes, drive on it the same dayBroken into several pieces, heaved up, or crumbling
Open joints or a gap where the slab meets the houseJoint caulking with backer rodOne side of the joint is higher (lift first)
Dingy, stained, or just starting to flakeCleaning plus a penetrating sealerDeep scaling, D-cracking, crumbling edges
One or two bad slabs in a decent drivewayReplace the worst, keep or lift the restMost of the slabs are bad
Broken up, sloped wrong, or you want a new layoutNone. Replace it.

Bottom row or right-hand column? You need new concrete. Our guide to concrete that's too damaged to lift covers the gray areas, and questions to ask before you tear it out helps you find out why the old slab failed so the new one doesn't follow it.

Thickness by Use

SlabAsk for at leastNotes
Walks, patios, landings4"
Driveway for cars, pickups, and SUVs4"Green Bay requires a surface that carries a 4,000-pound wheel load, which the city says is typically 4–6"
Where delivery trucks, dumpsters, RVs, or trailers will sit5"Per a Midwest ready-mix association's homeowner guide
Apron, curb cut, or public sidewalkWhatever your municipality specifiesRight-of-way: the city or village sets the rules

Going from 4" to 5" means 25 percent more concrete, so decide where heavy loads will actually go.

The Spec Sheet

Print or screenshot this section and send it with your bid request. The middle column is a reasonable target for outdoor flatwork in northeast Wisconsin, drawn from concrete industry guidance. The right column is for the contractor's answer. If they'd do something differently for your site, ask why, in writing.

#ItemTarget for an outdoor NE Wisconsin slabContractor's answer
1Utility locateDiggers Hotline (811) contacted at least 3 working days before digging
2Soil removalOld concrete, topsoil, roots, and soft soil dug out (one Midwest guide says at least 6" deep) and replaced with base
3BaseAt least 4" of crushed stone or gravel, compacted (one Midwest guide calls for 95 percent density)
4Soft spotsHow soft soil found after tear-out gets handled and priced, in writing
5Base on pour dayFirm, dampened if dry, no standing water, not frozen
6ThicknessPer the table above
7MixAir-entrained exterior flatwork mix, about 6 percent air (4.5–7.5 percent as delivered)
8Strength4,000–4,500 psi at 28 days
9Water0.45 maximum water-to-cement ratio; slump about 4" (5" max); no water beyond the ticket's allowance, and any additions written down
10Delivery ticketYou get a copy
11ReinforcementType (mesh, rebar, or fibers), how it's held off the base, mesh stopped or cut at control joints
12Meeting old concreteDoweled, or an isolation joint, where the new slab meets old slabs or the garage floor
13SlopeAbout 1/4" per foot, away from the house and garage
14Where the water goesDownspouts and sump discharge routed away from the new slab
15Control jointsSketched in advance: spacing in feet of 2–2.5 times the thickness in inches (8–10 ft on a 4" slab); near-square panels, no L-shapes
16Joint depth and timingAt least 1/4 of the slab depth; tooled during finishing or saw-cut within roughly 4–12 hours
17Isolation jointsFull depth where the slab meets the house, garage slab, steps, walks, and posts
18FinishBroom finish across the direction of traffic; no steel trowel, no added surface water, no finishing over bleed water
19CuringA named method (curing compound, wet curing, or plastic sheeting) for 7 days
20Cold weatherNo pour on frozen ground; blankets on site; protected from freezing at least 2 days
21EdgesForms pulled and soil backfilled against the slab edges
22PermitsWhich ones, and who pulls them
23ContractEverything above in the written contract, with changes in writing

Notes on the rows that matter most:

  • Row 9, water. The item most likely to slide on pour day. Each gallon per cubic yard loosens the mix about an inch and pushes the water-to-cement ratio up; we run the numbers in what's actually in concrete. A water-reducing admixture loosens a stiff load without weakening it.
  • Row 10, the ticket. Every truck's delivery ticket names the mix, and industry practice is to write down any water added on site. A copy costs nothing and tells you what went into your driveway.
  • Row 15, joints. Concrete shrinks as it dries and will crack somewhere. Joints decide where. See new concrete cracking for what's normal afterward.
  • Row 18, finish. Hard troweling and extra surface water weaken the top layer, the part that takes plows and salt. More in types of concrete finishes.
  • Row 19, curing. Industry guidance says concrete cured dry can lose as much as half its potential strength. If a curing compound is used, ask whether it has to come off before sealing; one Midwest guide says it should.

Worked Example: A Two-Car Driveway

Say you're replacing a 24' × 24' driveway.

  • Concrete at 4": 576 sq ft × 1/3 ft = 192 cubic feet, about 7.1 cubic yards. With the 4–10 percent extra industry guidance suggests ordering, that's roughly 7.4–7.8 yards. A ready-mix truck carries 8–12.
  • Concrete at 5": 240 cubic feet, about 8.9 yards before the extra. Same driveway, 25 percent more concrete.
  • Weight: at roughly 145 pounds per cubic foot, the 4" slab weighs close to 28,000 pounds, all of it riding on your base. That's why rows 2–5 matter.
  • Joints at 4": 8–10 ft spacing, so nine 8' × 8' panels.
  • Joints at 5": 10–12.5 ft spacing, so four 12' × 12' panels.
  • Slope: 1/4" per foot over 24 feet is 6" of fall from garage to street. If the street end has to meet a city-set apron grade, check that the numbers work before the forms go in.

Pour Day and the First 28 Days

WhenWhat should be happeningYour part
Before the truckForms checked for slope, base compacted and damp, no frost, blankets on site if nights are coldMove cars, keep kids and pets clear
Truck arrivesSlump checked; any added water stays within the ticket limit and gets written downGet your copy of the ticket
Placing and finishingStruck off and bull floated, then a wait for bleed water to leave before edging, jointing, and broomingNobody hosing water onto the surface
About 4–12 hours after finishingSaw-cutting, if joints are sawn. A 20°F drop in concrete temperature roughly doubles setting time, so cold days run later.Expect the crew back that evening or next morning
Days 0–2Must not freeze until it reaches about 500 psi, roughly two daysIf frost is forecast, blankets stay on
About a dayFoot traffic after about 24 hours, longer in cool weather (some guides say 48 hours)Walk on it gently
Days 0–7Curing under compound, covers, or waterLeave covers alone. Wet curing means kept wet, not wet-then-dry.
Day 7Passenger vehiclesPark, but stay off the edges
Day 28Design strengthMoving trucks, dumpsters, RVs
About a monthCaulk the joint at the house; once the caulk cures, apply a penetrating sealer on dry concrete at 40°F or warmerBook it or do it yourself
First winterNo deicers, sand for traction, and never ammonium nitrate or ammonium sulfateHose off tracked-in street salt on mild days. See winter concrete care.
First springCheck joints and cracks; fill soil washouts at the edgesTake photos in case you need your installer's warranty

Timing the Season in Northeast Wisconsin

Concrete cures best above about 50°F. Green Bay's normal overnight lows (1991–2020) show when that takes work.

Pour monthNormal lowWhat to plan forWhen to seal
April~35°FFrost may still be in the ground or thawing out (spring road weight limits average into early May). No frozen or soupy base.Late spring or early summer
May and June46–56°FGood once the frost is out and the base drainsAbout a month later
July and AugustWarmest of the yearHeat speeds setting: retarders, evaporation control, and prompt curing matter mostLate summer, the best sealing window
September~50°FA great monthOctober if it's dry and above 40°F; otherwise next summer
October~40°FCold-weather plan: blankets, possibly an accelerator, no frozen baseUsually next summer
November on~29°F and belowFull cold-weather protection, or wait for springNext summer

A late pour just means a first winter unsealed and unsalted, which is fine with sand. Pouring on a frozen base, or leaving a fresh slab uncovered with a hard frost coming, is not. If nobody can describe the protection plan, push the job to spring.

Permits and the Right-of-Way

Permit rules vary by municipality. Here's what the City of Green Bay lays out:

  • Driveway permit. Green Bay's driveway permit application needs a site plan. The residential fee was $75 when we checked, review typically takes 3–5 business days, and work has to start within six months. Ask the city whether your job needs one.
  • Hard-surface limits. Driveways count toward impervious surface, capped at 50 percent of the lot in R1 residential zoning. That matters if you're widening.
  • Aprons, public sidewalks, and curbs. These are public right-of-way. Work there takes a city-licensed, bonded sidewalk builder and a Public Works permit, and the city sets the grade. Owners are responsible for the sidewalk in front of their property.
  • Diggers Hotline. Wisconsin law (Statute 182.0175) requires at least three working days' notice before digging, homeowners included. Dial 811.

De Pere, Ashwaubenon, Howard, Suamico, and neighboring towns set their own rules, so call yours. Under Wisconsin's home improvement rule, the contractor must tell you which permits the job needs before you sign. More in how to choose a concrete contractor.

Questions

Common questions

How thick should a concrete driveway be in Wisconsin?

At least 4" for cars and SUVs, and 5" or more where delivery trucks, RVs, or trailers will sit. Green Bay requires a driveway surface that can carry a 4,000-pound wheel load, which the city says typically means 4–6".

What's the best time of year to pour concrete in Green Bay?

Late May through September: the frost is out, nights are mild, and there's time to seal before winter. April and October pours can work with cold-weather precautions.

Can concrete be poured in November?

Yes, with protection. The ground can't be frozen, and the slab has to be kept from freezing until it reaches about 500 psi, roughly two days. That means insulated blankets and a crew watching the forecast.

When should I seal new concrete?

After about a month of curing, or whatever the sealer label says, on clean, dry concrete at 40°F or warmer. Caulk the joints first and let the caulk cure. A fall pour usually gets sealed the next summer.

Does Rise & Shine pour new concrete?

No. We lift, caulk, clean, and seal existing concrete, and coat garage floors. If your slab needs replacing, we'll say so. Once new concrete cures, we can caulk and seal it.

Keep reading

Related

Learn · Concrete Care
What Is Concrete Made Of?

Cement, stone, sand, water, and air: what concrete is made of, why extra water and missing air ruin Wisconsin slabs, and what to ask for on a new pour.

Learn · Concrete Care
Before You Replace Concrete

Before you replace a sidewalk, driveway, or patio: why it sank, whether new concrete will too, what to ask the contractor, and first-winter care in Wisconsin.

Learn · Concrete Care
New Concrete Cracking?

Cracks in your new driveway or patio? Here's which cracks are normal, which ones point to a real problem, and what to ask your installer.

Learn · Concrete Care
Preventing Concrete Cracks

Some cracking is normal. Here's what to require from your installer on a new slab, and the habits that keep older concrete from cracking more.

Learn · Concrete Lifting
How to Keep Concrete From Sinking

You can't change Wisconsin clay, but you can control water. Settling prevention ranked by impact and effort, a yearly 10-minute check, and a 1/4-inch plan.